Engineer Gold Mines Ltd. (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ) has announced that its 2026 Phase I exploration program is now underway on the 100% owned Engineer Gold Project, located 30 kilometres southwest of Atlin in northwestern British Columbia. The property spans 18,319 hectares and includes the historic Engineer Gold Mine, the TAG Property, the Wann River Prospect, and other mineral occurrences.
Phase I consists of soil and rock sampling at the Engineer Mine area, soil geochemistry, and an in-depth core review and resampling at the TAG Property. The company is fully permitted for a subsequent Phase II program that may include diamond drilling, excavator trenching, and induced polarization geophysical surveys in the Engineer Mine area. Phase II plans will be announced once finalized.
The Engineer Project hosts multiple mineralization styles, including high-grade epithermal gold-silver veins, polymetallic veins, and structurally controlled bulk tonnage gold systems. The Phase I program at the Engineer Mine is designed to expand high-grade gold mineralization and adjacent bulk tonnage targets along previously identified structural corridors, Shear A and Shear B, which have been traced by geophysics and geochemistry for over three kilometres south of the past-producing mine.
At the TAG Property, six kilometres north of the Engineer Mine, Phase I includes a rigorous core review and infill core sampling program. Historical drilling from 2006 to 2008 totalled 11,520 metres in 69 holes (Fekete and Simper 2009; Fekete and Skinner 2007; ARIS reports #30931 and #29581). Recent on-site re-examination revealed that several drill intercepts crossing the mineralized trend were not fully sampled, and in some instances, samples were not collected adjacent to those hosting significant gold values. Infill and expanded sampling will enable a detailed model to target potential expansion of gold mineralization and facilitate an updated resource estimate for TAG. Additional soil geochemical sampling will also be completed, as prior sampling returned anomalous gold and silver values uphill from known mineralization, indicating potential for a subparallel second mineralizing structure.
The Wann River Prospect, four kilometres south of the Engineer Mine, represents a highly prospective, underexplored target. Historic diamond drilling of 17 holes in 2011 returned significant intercepts, including 11.3 g/t Au and 76.2 g/t Ag over one metre in hole WR030211, and 11.3 g/t Au and 94.8 g/t Ag over one metre in hole WR040111 (BC ARIS Report #32478). A quartz grab sample from the Lum showing assayed 263 g/t gold and 1,350 g/t silver (ARIS Report #32004).
For leaders in the mining and technology sectors, this exploration program underscores the importance of revisiting historical data with modern techniques. The identification of unsampled intervals and potential new structures could significantly enhance resource estimates, impacting project economics and investment decisions. The use of systematic core review and soil geochemistry demonstrates a methodical approach to de-risking exploration and maximizing value from past-producing assets. As the company advances towards a Phase II drill program, stakeholders will be watching for updates on mineralization expansion and potential resource upgrades.

